can see if i find some pix on manifolds.. its in 3 parts with V-Band clamps.. no modifying on chassie is needed.. only Sr20 enginemounts in chassie needs to be removed.. and to get downpipe fitted its needed to make a tunnel in innerfender.. not actually needed, but i wanted the downpipe a bit away from ignitioncoils, theese dont like heating.. and if anyone is intrested i can fix Billet flywheels with double fittings (ACT and Sachs 765) to m60 ore m62 quite cheap..