so yesterday got the car down to ET... what a f**king mission it was to. front of this things defs gotta come up a bit. dont even have a pinky finger between tire and chassis/strut tops. but eh. thats future dans problem.
got my loom installed as well (engine) didnt realise the guy modding it was going to keep the PCM controlling the fuel and thermos.. so i could have gotten away with using a 6 circuit painless wiring kit. but shit happens. so ill be rewiring some bits and using the fuel pump switches for windows.. or something. as i said. future dans problem
its nakey atm due to bits getting painted and such this fortnite (hopefully by the time im home)
original plan was to go 2.5" from the 6ltr manifolds. into a Y pipe to a single resi... into my old shotgun tips.
had a chat to marky about it all, basicly asked him if it was his what would he do... settled on the VE manifolds into 2.5" into a X section. single resi. into twin 3" back from that. looks pretty sedate from the rear. but its tucked super high. and should sound pretty tits.
radiator mounts are done. its a lil wonkyish due to the rad supports half munted... in the mean time itll do. up the track i think it'll be tubed. (awaits spotman to pipe in with his usual LS1/tubeframe/knuckles rant haha)
bulk ground clearence. came up pretty sweet. so yeah thats where its atm.
still awaiting fuel gear atm. otherwise i could fire it up.
looms almost done.. it essentially just needs to be all wrapped up and tied down. then interior back in.
im so so behind with this thing atm, and looking unlikely for the big matsuri event i was going to have it at next month... still trying tho!